Electrical update

Electrical update

The electricians have been here for a month now, doing the finish.  This includes installing the outlets, light fixtures, switches, and the Lutron system that will control it all. There is lots of lighting, including LED cans, sconces, and surface mount fixtures on the inside. There are quite a few really cool craftsman fixtures onRead more about Electrical update[…]

Solar

Solar

The solar installers installed half the solar array this week.  We decided to only do half now as we want to be sure we can use all the production, and it saves us a little money up front. That’s 8kW installed and room for another 6.5 kW on the other side, with mounts already installed.Read more about Solar[…]