OUR NEW HOUSE

One day of construction at a time

An unwanted post

An unwanted post

Post as in beam, not post as in blog. 🙂 Sometimes the reality of the house isn’t clear from flat 2D floor plans and engineering drawings.  As the house gets built, the true nature of things reveal themselves, sometimes requiring changes to either improve aesthetics or something that doesn’t function well in practice. One exampleRead more about An unwanted post[…]

Framing has begun

Framing has begun

The framers have been on site for a week or so mapping out the basement walls. The last few days they’ve been installing the bottom plates on the top of the wall and for the basement inner walls. Today they started throwing up the first actual walls.  Pretty exciting!

Basement slab

Basement slab

The pouring of the basement slab is somewhat of a milestone, as it means we are close to getting out of the ground and building up. The concrete team has been working for weeks to prep the basement floor for the slab pour.  The floor started out with just bare dirt, the interior wall footings,Read more about Basement slab[…]