We tore a couple of new holes in the original stone wall in front of our property, to make way for the new driveway on the opposite side of our frontage, and the walkway.  We repaired the opening for the old driveway, and in the last week, have started work repairing the rest of the wall.

At the driveway, we needed to bridge the gap between the existing wall and the new landscape walls we put in that go up our driveway.

At the walkway, we need to wrap from the existing wall around a small column and then up the side of the stairs.

Once the stone work is done going up the steps, we can have the iron railings installed to replace the temporary wooden ones.