OUR NEW HOUSE

One day of construction at a time

Stained wood

Stained wood

Four painters spend the last week applying stain and lacquer varnish to the doors and windows in our master bedroom.  What a time consuming process it is! But the results are pretty outstanding. There are two more areas that have substantial staining to do – the living / dining rooms, and the kitchen / familyRead more about Stained wood[…]

Fake sandstone

Fake sandstone

Our local Santa Barbara sandstone is great, but it is an expensive treatment to apply.  For a long seat wall in the back yard, we opted for a faux sandstone cap instead, made from colored and textured concrete. Here is the 8″ block wall that is our starting point for the seat wall. They formRead more about Fake sandstone[…]

Plumbing update

Plumbing update

For the last few weeks the plumbers have been working to complete the plumbing. The first thing we did was to sort the fixtures by sink, and then mark the counters for the drilling of holes. Next, they worked on installing the plumbing and appliances in the mechanical room, including the water heater and softener.Read more about Plumbing update[…]

More flooring

More flooring

With the hardest part behind them, the flooring installers installed the last bit of regular flooring today. Here is the yoga room: And the family room: Now, all we have left is the stairs.  With the the installation of the stair treads and risers, work can begin on the guard rails and hand rails, anotherRead more about More flooring[…]

Ooops

Ooops

I have a desk set that works really well for me now.  When we went to design my built-in office furniture, I used the same dimensions.  However, looking at the desk one day, I noticed that the space for my chair under the part that I was likely to be using the most, was tooRead more about Ooops[…]

Flooring

Flooring

After much delay, our flooring finally arrived and the installation began last week.  The flooring looks great.  Here is my home office floor. We are definitely behind schedule with the floor, and it is pushing quite a few things out that depend on it, like the installation of the remainder of the baseboard, the triming,Read more about Flooring[…]

Master bath

Master bath

Our master bathroom is the first bathroom to have the tile complete.  We’ve got others that are close to being done, but they stubbornly have this or that missing. We are pretty thrilled with how the master bathroom came out.  It looks pretty elegant, without being over the top.