The concrete contractor poured the garage slab and the front porch slab on Friday. Now there is nothing holding the framers back from finishing the first floor and moving on to the second. They expect to have the roof sheeted in about 8 weeks. Here is the time lapse of the slab pour:
Here are some before and after pictures: