In addition to the landscape main irrigation lines being installed and buried last week, we checked on more piece of flat work off our list – the stretch of gutter along our old driveway entrance.
All the sandstone curb was moved from the side of the old driveway mouth, (the curved parts), and the new driveway mouth, to fill in this stretch. There is one small piece of fake sandstone where the bio-filtration basin drains into the gutter which will eventually go to the storm drain system.
This week we will patch the asphalt and that side of our frontage will be largely done.