OUR NEW HOUSE

One day of construction at a time

Occupancy!

Occupancy!

Despite the plumbing disaster, we are moving forward.  The mitigation specialists are hard at work now tearing out the drywall and insulation in the basement, and have sealed it off from the rest of the house. We’ve brought in a load of stuff from our temporary rental, and have started unpacking the items we hadRead more about Occupancy![…]

Front steps

Front steps

It’s been so long since we’ve been able to get onto our property without walking over dirt, it is almost unbelievable.  Yesterday, they poured the front steps and walkway, and today, we can walk on it. It was quite a project, and required 10 yards of concrete.  We colored the concrete, a slight sandstone tint. Read more about Front steps[…]

Catastrophe

Catastrophe

Three days before move-in, catastrophe has struck our new house. Over the weekend, a plumbing fitting connecting the kitchen island pot filler to the water line had a crack, and developed a leak.  It seems our plumbers over-tightened a plastic fitting and it caused a crack.  The water dripped down behind the stove, and foundRead more about Catastrophe[…]

Appliances

Appliances

We had our appliances installed this week.  Here is the kitchen before: And after: Like most things related to construction, it didn’t go exactly according to plan.  The stone contractor wanted to cut in the stove cutout when the stove was here, which they did, but then when the installers tried to push the stoveRead more about Appliances[…]

Carpet

Carpet

The carpeting was installed in the last two days.  We have 4 bedrooms, a play room, and the master closet that got carpet.  To keep things simple, we used one color for all the bedrooms and the closet, and a different one for the play room.  It looks nice and is helping to make theRead more about Carpet[…]