All the drywall has been hung for a couple of weeks now, and the crew has made great progress with the plastering. The 2nd floor is now completely plastered, and the first floor and basement have much of the seams, holes, doorways, fixtures, sockets and switches plastered. the last layer of plaster is pretty thin and is intentionally imperfect, as it gives it the look and feel of an older structure, and costs much less than a perfectly smooth plaster job would.
Here are some of the finished walls.
And here is the progress of one wall from start to finish.