Drywall is going in rapidly. They are now almost done putting up the drywall on the first floor. Here is our living room.
They have installed all the corner bead on the second floor and have started taping and mudding the joints.
We have a tentative date of November 20th for the first cabinets to go in, and hopefully the laying of the stone for the outdoor porches, patios, and stairs should start about that time.