{"id":2066,"date":"2019-05-30T14:38:30","date_gmt":"2019-05-30T22:38:30","guid":{"rendered":"http:\/\/buildingfromscratch.com\/?p=2066"},"modified":"2019-05-31T09:10:53","modified_gmt":"2019-05-31T17:10:53","slug":"storm-water-management","status":"publish","type":"post","link":"https:\/\/buildingfromscratch.com\/index.php\/2019\/05\/30\/storm-water-management\/","title":{"rendered":"Storm water management"},"content":{"rendered":"<p>The storm water management for our property was designed by a civil engineer to met what our city calls Tier 3 storm water management.\u00a0 The tiers are just dependent on the size of the project, and ours was a large one, so we got the highest tier.<\/p>\n<p>The idea of storm water management is that you collect and filter all the water runoff on a property and \/ or create facilities that allow it to percolate into the ground.\u00a0 In our property, we have\u00a0 both.<\/p>\n<p>The bio-filtration basin does al the filtering of the collected water.\u00a0 The permeable paver driveway allows water to flow through and soak into the ground.<\/p>\n<p><strong>Bio-filtration basin<\/strong><\/p>\n<p>Our city doesn&#8217;t have someone that is &#8220;qualified&#8221; to sign-off on tier 3 projects, so we had to bring in another civil engineer for the sign-off, and supervision of the bio-filtration basin completion.\u00a0 We had to wait to finish that part until the special inspector could observe.<\/p>\n<p>The completion involved adding the plumbing (French drain at the bottom and overflow) and the materials inside.\u00a0 Here is the basin design.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2067\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/05\/Screen-Shot-2019-05-30-at-3.24.27-PM-1280x514.png\" alt=\"\" width=\"730\" height=\"293\" srcset=\"https:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/05\/Screen-Shot-2019-05-30-at-3.24.27-PM-1280x514.png 1280w, https:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/05\/Screen-Shot-2019-05-30-at-3.24.27-PM-300x120.png 300w, https:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/05\/Screen-Shot-2019-05-30-at-3.24.27-PM-768x308.png 768w, https:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/05\/Screen-Shot-2019-05-30-at-3.24.27-PM.png 1723w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2080\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/05\/IMG_6213-768x1024.jpeg\" alt=\"\" width=\"730\" height=\"973\" srcset=\"https:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/05\/IMG_6213-768x1024.jpeg 768w, https:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/05\/IMG_6213-225x300.jpeg 225w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>First came 6 inches of large gravel, then filter fabric.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2081\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/05\/IMG_6230-768x1024.jpeg\" alt=\"\" width=\"730\" height=\"973\" srcset=\"https:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/05\/IMG_6230-768x1024.jpeg 768w, https:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/05\/IMG_6230-225x300.jpeg 225w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>Finally, 24 inches of the special soil mixture, and this is what it looks like done.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2083\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/05\/IMG_6543-768x1024.jpeg\" alt=\"\" width=\"730\" height=\"973\" srcset=\"https:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/05\/IMG_6543-768x1024.jpeg 768w, https:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/05\/IMG_6543-225x300.jpeg 225w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>We&#8217;ll probably build a lattice like structure out of some of the old redwood flood joists we pulled out of the house we tore down, as that 24&#8243; drop is a little more than I like having in our front yard where our kids play.\u00a0 Add that to the list of pick-up projects that remain.<\/p>\n<p>The theory is that the soil mixture harbors bacteria that can consume anything impure in any water runoff, so that only clean water will be put into the city&#8217;s storm water system (i.e., the street, which leads to storm drains).<\/p>\n<p>In reality, we are collecting water runoff from the roof gutters and surface drains around the property. There really isn&#8217;t anything harmful in any water that comes from those; it just rain water.\u00a0 But rules are rules.\u00a0 Sigh.<\/p>\n<p><strong>Permeable paver driveway<\/strong><\/p>\n<p>I posted some entries on the development of the driveway (<a href=\"\/index.php\/2019\/03\/06\/driveway\/\">here<\/a>, <a href=\"\/index.php\/2019\/02\/21\/driveway-progress\/\">here<\/a>, and <a href=\"\/index.php\/2019\/02\/14\/all-dressed-up-and-nowhere-to-go\/\">here<\/a>).\u00a0 The driveway, for the most part, seems like a normal driveway, despite being of the permeable paver variety.\u00a0 The gravel in the larger spacing between pavers does seem to come out from time to time, but I presume that will eventually settle down after what is going to come out, has come out.\u00a0 We&#8217;ll probably help it out a bit in a couple of weeks when we get the house power washed and windows cleaned; we&#8217;ll probably have them wash the driveway as well to get rid of the fine dust that remains from cutting pavers, and any dirt that got on them.\u00a0 I&#8217;m sure that will loosen up some more gravel.<\/p>\n<hr \/>\n<p>Now both of these features are done, and signed off on.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The storm water management for our property was designed by a civil engineer to met what our city calls Tier 3 storm water management.\u00a0 The tiers are just dependent on the size of the project, and ours was a large one, so we got the highest tier. The idea of storm water management is that<a class=\"moretag\" href=\"https:\/\/buildingfromscratch.com\/index.php\/2019\/05\/30\/storm-water-management\/\"><span class=\"screen-reader-text\">Read more about Storm water management<\/span>[&#8230;]<\/a><\/p>\n","protected":false},"author":1,"featured_media":2067,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[36],"tags":[],"class_list":["post-2066","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-hardscape"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.1.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"The storm water management for our property was designed by a civil engineer to met what our city calls Tier 3 storm water management. The tiers are just dependent on the size of the project, and ours was a large one, so we got the highest tier. The idea of storm water management is that\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Peter\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/buildingfromscratch.com\/index.php\/2019\/05\/30\/storm-water-management\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.1.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Building From Scratch - From the basement up\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Storm water management - Building From Scratch\" \/>\n\t\t<meta property=\"og:description\" content=\"The storm water management for our property was designed by a civil engineer to met what our city calls Tier 3 storm water management. The tiers are just dependent on the size of the project, and ours was a large one, so we got the highest tier. The idea of storm water management is that\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/buildingfromscratch.com\/index.php\/2019\/05\/30\/storm-water-management\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2019-05-30T22:38:30+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2019-05-31T17:10:53+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Storm water management - Building From Scratch\" \/>\n\t\t<meta name=\"twitter:description\" content=\"The storm water management for our property was designed by a civil engineer to met what our city calls Tier 3 storm water management. The tiers are just dependent on the size of the project, and ours was a large one, so we got the highest tier. The idea of storm water management is that\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/index.php\\\/2019\\\/05\\\/30\\\/storm-water-management\\\/#blogposting\",\"name\":\"Storm water management - Building From Scratch\",\"headline\":\"Storm water management\",\"author\":{\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/index.php\\\/author\\\/peter\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/buildingfromscratch.com\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/Screen-Shot-2019-05-30-at-3.24.27-PM.png\",\"width\":1723,\"height\":692},\"datePublished\":\"2019-05-30T14:38:30-08:00\",\"dateModified\":\"2019-05-31T09:10:53-08:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/index.php\\\/2019\\\/05\\\/30\\\/storm-water-management\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/index.php\\\/2019\\\/05\\\/30\\\/storm-water-management\\\/#webpage\"},\"articleSection\":\"Hardscape\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/index.php\\\/2019\\\/05\\\/30\\\/storm-water-management\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/buildingfromscratch.com#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/buildingfromscratch.com\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/index.php\\\/category\\\/hardscape\\\/#listItem\",\"name\":\"Hardscape\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/index.php\\\/category\\\/hardscape\\\/#listItem\",\"position\":2,\"name\":\"Hardscape\",\"item\":\"https:\\\/\\\/buildingfromscratch.com\\\/index.php\\\/category\\\/hardscape\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/index.php\\\/2019\\\/05\\\/30\\\/storm-water-management\\\/#listItem\",\"name\":\"Storm water management\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/buildingfromscratch.com#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/index.php\\\/2019\\\/05\\\/30\\\/storm-water-management\\\/#listItem\",\"position\":3,\"name\":\"Storm water management\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/index.php\\\/category\\\/hardscape\\\/#listItem\",\"name\":\"Hardscape\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/#organization\",\"name\":\"Building From Scratch\",\"description\":\"From the basement up\",\"url\":\"https:\\\/\\\/buildingfromscratch.com\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/index.php\\\/author\\\/peter\\\/#author\",\"url\":\"https:\\\/\\\/buildingfromscratch.com\\\/index.php\\\/author\\\/peter\\\/\",\"name\":\"Peter\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/index.php\\\/2019\\\/05\\\/30\\\/storm-water-management\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/bcc0edafc982c0ac04fb57bd5d41b6a4824a72b3f92a48188753c8941ba67738?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Peter\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/index.php\\\/2019\\\/05\\\/30\\\/storm-water-management\\\/#webpage\",\"url\":\"https:\\\/\\\/buildingfromscratch.com\\\/index.php\\\/2019\\\/05\\\/30\\\/storm-water-management\\\/\",\"name\":\"Storm water management - Building From Scratch\",\"description\":\"The storm water management for our property was designed by a civil engineer to met what our city calls Tier 3 storm water management. The tiers are just dependent on the size of the project, and ours was a large one, so we got the highest tier. The idea of storm water management is that\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/index.php\\\/2019\\\/05\\\/30\\\/storm-water-management\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/index.php\\\/author\\\/peter\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/index.php\\\/author\\\/peter\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/buildingfromscratch.com\\\/wp-content\\\/uploads\\\/2019\\\/05\\\/Screen-Shot-2019-05-30-at-3.24.27-PM.png\",\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/index.php\\\/2019\\\/05\\\/30\\\/storm-water-management\\\/#mainImage\",\"width\":1723,\"height\":692},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/index.php\\\/2019\\\/05\\\/30\\\/storm-water-management\\\/#mainImage\"},\"datePublished\":\"2019-05-30T14:38:30-08:00\",\"dateModified\":\"2019-05-31T09:10:53-08:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/#website\",\"url\":\"https:\\\/\\\/buildingfromscratch.com\\\/\",\"name\":\"Building From Scratch\",\"description\":\"From the basement up\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/buildingfromscratch.com\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Storm water management - Building From Scratch","description":"The storm water management for our property was designed by a civil engineer to met what our city calls Tier 3 storm water management. The tiers are just dependent on the size of the project, and ours was a large one, so we got the highest tier. The idea of storm water management is that","canonical_url":"https:\/\/buildingfromscratch.com\/index.php\/2019\/05\/30\/storm-water-management\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/buildingfromscratch.com\/index.php\/2019\/05\/30\/storm-water-management\/#blogposting","name":"Storm water management - Building From Scratch","headline":"Storm water management","author":{"@id":"https:\/\/buildingfromscratch.com\/index.php\/author\/peter\/#author"},"publisher":{"@id":"https:\/\/buildingfromscratch.com\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/05\/Screen-Shot-2019-05-30-at-3.24.27-PM.png","width":1723,"height":692},"datePublished":"2019-05-30T14:38:30-08:00","dateModified":"2019-05-31T09:10:53-08:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/buildingfromscratch.com\/index.php\/2019\/05\/30\/storm-water-management\/#webpage"},"isPartOf":{"@id":"https:\/\/buildingfromscratch.com\/index.php\/2019\/05\/30\/storm-water-management\/#webpage"},"articleSection":"Hardscape"},{"@type":"BreadcrumbList","@id":"https:\/\/buildingfromscratch.com\/index.php\/2019\/05\/30\/storm-water-management\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/buildingfromscratch.com#listItem","position":1,"name":"Home","item":"https:\/\/buildingfromscratch.com","nextItem":{"@type":"ListItem","@id":"https:\/\/buildingfromscratch.com\/index.php\/category\/hardscape\/#listItem","name":"Hardscape"}},{"@type":"ListItem","@id":"https:\/\/buildingfromscratch.com\/index.php\/category\/hardscape\/#listItem","position":2,"name":"Hardscape","item":"https:\/\/buildingfromscratch.com\/index.php\/category\/hardscape\/","nextItem":{"@type":"ListItem","@id":"https:\/\/buildingfromscratch.com\/index.php\/2019\/05\/30\/storm-water-management\/#listItem","name":"Storm water management"},"previousItem":{"@type":"ListItem","@id":"https:\/\/buildingfromscratch.com#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/buildingfromscratch.com\/index.php\/2019\/05\/30\/storm-water-management\/#listItem","position":3,"name":"Storm water management","previousItem":{"@type":"ListItem","@id":"https:\/\/buildingfromscratch.com\/index.php\/category\/hardscape\/#listItem","name":"Hardscape"}}]},{"@type":"Organization","@id":"https:\/\/buildingfromscratch.com\/#organization","name":"Building From Scratch","description":"From the basement up","url":"https:\/\/buildingfromscratch.com\/"},{"@type":"Person","@id":"https:\/\/buildingfromscratch.com\/index.php\/author\/peter\/#author","url":"https:\/\/buildingfromscratch.com\/index.php\/author\/peter\/","name":"Peter","image":{"@type":"ImageObject","@id":"https:\/\/buildingfromscratch.com\/index.php\/2019\/05\/30\/storm-water-management\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/bcc0edafc982c0ac04fb57bd5d41b6a4824a72b3f92a48188753c8941ba67738?s=96&d=mm&r=g","width":96,"height":96,"caption":"Peter"}},{"@type":"WebPage","@id":"https:\/\/buildingfromscratch.com\/index.php\/2019\/05\/30\/storm-water-management\/#webpage","url":"https:\/\/buildingfromscratch.com\/index.php\/2019\/05\/30\/storm-water-management\/","name":"Storm water management - Building From Scratch","description":"The storm water management for our property was designed by a civil engineer to met what our city calls Tier 3 storm water management. The tiers are just dependent on the size of the project, and ours was a large one, so we got the highest tier. The idea of storm water management is that","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/buildingfromscratch.com\/#website"},"breadcrumb":{"@id":"https:\/\/buildingfromscratch.com\/index.php\/2019\/05\/30\/storm-water-management\/#breadcrumblist"},"author":{"@id":"https:\/\/buildingfromscratch.com\/index.php\/author\/peter\/#author"},"creator":{"@id":"https:\/\/buildingfromscratch.com\/index.php\/author\/peter\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/05\/Screen-Shot-2019-05-30-at-3.24.27-PM.png","@id":"https:\/\/buildingfromscratch.com\/index.php\/2019\/05\/30\/storm-water-management\/#mainImage","width":1723,"height":692},"primaryImageOfPage":{"@id":"https:\/\/buildingfromscratch.com\/index.php\/2019\/05\/30\/storm-water-management\/#mainImage"},"datePublished":"2019-05-30T14:38:30-08:00","dateModified":"2019-05-31T09:10:53-08:00"},{"@type":"WebSite","@id":"https:\/\/buildingfromscratch.com\/#website","url":"https:\/\/buildingfromscratch.com\/","name":"Building From Scratch","description":"From the basement up","inLanguage":"en-US","publisher":{"@id":"https:\/\/buildingfromscratch.com\/#organization"}}]},"og:locale":"en_US","og:site_name":"Building From Scratch - From the basement up","og:type":"article","og:title":"Storm water management - Building From Scratch","og:description":"The storm water management for our property was designed by a civil engineer to met what our city calls Tier 3 storm water management. The tiers are just dependent on the size of the project, and ours was a large one, so we got the highest tier. The idea of storm water management is that","og:url":"https:\/\/buildingfromscratch.com\/index.php\/2019\/05\/30\/storm-water-management\/","article:published_time":"2019-05-30T22:38:30+00:00","article:modified_time":"2019-05-31T17:10:53+00:00","twitter:card":"summary_large_image","twitter:title":"Storm water management - Building From Scratch","twitter:description":"The storm water management for our property was designed by a civil engineer to met what our city calls Tier 3 storm water management. The tiers are just dependent on the size of the project, and ours was a large one, so we got the highest tier. The idea of storm water management is that"},"aioseo_meta_data":{"post_id":"2066","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2023-06-15 17:52:01","updated":"2025-06-19 06:11:40","focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/buildingfromscratch.com\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/buildingfromscratch.com\/index.php\/category\/hardscape\/\" title=\"Hardscape\">Hardscape<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tStorm water management\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/buildingfromscratch.com"},{"label":"Hardscape","link":"https:\/\/buildingfromscratch.com\/index.php\/category\/hardscape\/"},{"label":"Storm water management","link":"https:\/\/buildingfromscratch.com\/index.php\/2019\/05\/30\/storm-water-management\/"}],"_links":{"self":[{"href":"https:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/2066","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/comments?post=2066"}],"version-history":[{"count":3,"href":"https:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/2066\/revisions"}],"predecessor-version":[{"id":2084,"href":"https:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/2066\/revisions\/2084"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/media\/2067"}],"wp:attachment":[{"href":"https:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/media?parent=2066"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/categories?post=2066"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/tags?post=2066"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}