{"id":947,"date":"2017-10-06T03:42:28","date_gmt":"2017-10-06T11:42:28","guid":{"rendered":"http:\/\/buildingfromscratch.com\/?p=947"},"modified":"2017-10-06T03:43:09","modified_gmt":"2017-10-06T11:43:09","slug":"connecting-the-house-utilities","status":"publish","type":"post","link":"http:\/\/buildingfromscratch.com\/index.php\/2017\/10\/06\/connecting-the-house-utilities\/","title":{"rendered":"Connecting the house utilities"},"content":{"rendered":"<p>We started the work to run the utilities from the pole at the street to our demarcation point at the side of the garage, where the main electrical panel and the low voltage panels are.\u00a0 Any new construction or significant remodel requires under grounding of the utilities from the pole to the house.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-948\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6542-1280x960.jpg\" alt=\"\" width=\"730\" height=\"548\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6542-1280x960.jpg 1280w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6542-300x225.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6542-768x576.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>There is quite a bit of trenching that had to be done.\u00a0 From the pole, we feed an electrical box in the grassy area between the sidewalk and the street, and then it runs underground to the house.\u00a0 The phone and cable will run straight from the bottom of the pole to the street and will both get 2 inch conduits in case we need the room.\u00a0 We are also running an extra 2 inch conduit in case at some future time another service is offered that requires a separate feed (like fiber optic internet).<\/p>\n<p>You can see the yellow temporary power pole on the right behind the green construction fence.\u00a0 Once our utilities are under-grounded.<\/p>\n<p>Here is the house end of the run.\u00a0 There are also some conduits there that will feed the pool cabana and the places where we can add a backup generator and \/ or fuel cell generator there.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-967\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6553-1280x960.jpg\" alt=\"\" width=\"730\" height=\"548\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6553-1280x960.jpg 1280w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6553-300x225.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6553-768x576.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>Here is where it all hits the pole.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-968\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6559-768x1024.jpg\" alt=\"\" width=\"730\" height=\"973\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6559-768x1024.jpg 768w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6559-225x300.jpg 225w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>The electrical conduit gets laid at the bottom of a 3 foot or so deep trench.\u00a0 It then gets covered with dirt about half way up the trench and some special metal tape gets laid down.\u00a0 This allows someone with a special detector to find the path of the electrical conduit under the driveway.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-969\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6564-768x1024.jpg\" alt=\"\" width=\"730\" height=\"973\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6564-768x1024.jpg 768w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6564-225x300.jpg 225w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>Then the phone and cable conduit get laid on top, along with the spare.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-970\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6566-768x1024.jpg\" alt=\"\" width=\"730\" height=\"973\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6566-768x1024.jpg 768w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6566-225x300.jpg 225w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>At the garage, the panel came a bit proud of the siding.\u00a0 We decided to work with it and build in a utility closet, with doors built to match the garage doors.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-975\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6580-1280x960.jpg\" alt=\"\" width=\"730\" height=\"548\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6580-1280x960.jpg 1280w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6580-300x225.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6580-768x576.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>We started the work to run the utilities from the pole at the street to our demarcation point at the side of the garage, where the main electrical panel and the low voltage panels are.\u00a0 Any new construction or significant remodel requires under grounding of the utilities from the pole to the house. There is<a class=\"moretag\" href=\"http:\/\/buildingfromscratch.com\/index.php\/2017\/10\/06\/connecting-the-house-utilities\/\"><span class=\"screen-reader-text\">Read more about Connecting the house utilities<\/span>[&#8230;]<\/a><\/p>\n","protected":false},"author":1,"featured_media":948,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[28,15],"tags":[],"class_list":["post-947","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-audio-video-network","category-electrical"],"aioseo_notices":[],"_links":{"self":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/947","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/comments?post=947"}],"version-history":[{"count":3,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/947\/revisions"}],"predecessor-version":[{"id":976,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/947\/revisions\/976"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/media\/948"}],"wp:attachment":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/media?parent=947"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/categories?post=947"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/tags?post=947"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}