{"id":313,"date":"2016-07-29T13:43:51","date_gmt":"2016-07-29T21:43:51","guid":{"rendered":"http:\/\/buildingfromscratch.com\/?p=313"},"modified":"2016-08-21T17:51:18","modified_gmt":"2016-08-22T01:51:18","slug":"basement-slab","status":"publish","type":"post","link":"http:\/\/buildingfromscratch.com\/index.php\/2016\/07\/29\/basement-slab\/","title":{"rendered":"Basement slab"},"content":{"rendered":"<p>The pouring of the basement slab is somewhat of a milestone, as it means we are close to getting out of the ground and building up.<\/p>\n<p>The concrete team has been working for weeks to prep the basement floor for the slab pour.\u00a0 The floor started out with just bare dirt, the interior wall footings, and the sewer rough-in.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-314\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7561-1024x768.jpg\" alt=\"IMG_7561\" width=\"730\" height=\"548\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7561-1024x768.jpg 1024w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7561-300x225.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7561-768x576.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>You can see the brown line on the wall which indicates the level that the slab will reach.<\/p>\n<p>The first step was to lay down a layer of sand and tamp it down with a vibration machine.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-316\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7569-1-982x1024.jpg\" alt=\"IMG_7569\" width=\"730\" height=\"761\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7569-1-982x1024.jpg 982w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7569-1-288x300.jpg 288w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7569-1-768x801.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>Next, they laid down plastic to prevent water intrusion up through the slab, and then more sand, and tamped it down again.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-317\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7575-1024x736.jpg\" alt=\"IMG_7575\" width=\"730\" height=\"525\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7575-1024x736.jpg 1024w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7575-300x216.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7575-768x552.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>Then came the re-bar.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-318\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7900-1024x473.jpg\" alt=\"IMG_7900\" width=\"730\" height=\"337\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7900-1024x473.jpg 1024w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7900-300x139.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7900-768x355.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>Yesterday, pouring the concrete began early and took about three hours.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-319\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7925-1024x768.jpg\" alt=\"IMG_7925\" width=\"730\" height=\"548\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7925-1024x768.jpg 1024w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7925-300x225.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7925-768x576.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>The timing of process is somewhat time critical (you have to work it while its wet obviously), so they had 13 people working the pour.\u00a0 Once the initial pour was done, for the finishers, the work began.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-320\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7937-1024x768.jpg\" alt=\"IMG_7937\" width=\"730\" height=\"548\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7937-1024x768.jpg 1024w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7937-300x225.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7937-768x576.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>They kept going over and over the concrete with hand trowels making sure everything was level and smooth.\u00a0\u00a0 This took most of the rest of the day as the concrete was drying a little slower than expected.\u00a0 The last step was the polishing machine.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-324\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/Screen-Shot-2016-07-29-at-2.42.14-PM-1024x505.jpg\" alt=\"Screen Shot 2016-07-29 at 2.42.14 PM\" width=\"730\" height=\"360\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/Screen-Shot-2016-07-29-at-2.42.14-PM-1024x505.jpg 1024w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/Screen-Shot-2016-07-29-at-2.42.14-PM-300x148.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/Screen-Shot-2016-07-29-at-2.42.14-PM-768x379.jpg 768w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/Screen-Shot-2016-07-29-at-2.42.14-PM.jpg 1088w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>When it was all said and done, we had a slab.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-321\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7943-1024x768.jpg\" alt=\"IMG_7943\" width=\"730\" height=\"548\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7943-1024x768.jpg 1024w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7943-300x225.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7943-768x576.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>This is what it looked like the next morning from down inside the basement.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-322\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7960-1024x346.jpg\" alt=\"IMG_7960\" width=\"730\" height=\"247\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7960-1024x346.jpg 1024w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7960-300x101.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7960-768x259.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>Lastly, they cut some shallow grooves in the concrete so that any cracking due to expansion and contraction occurs along nice groove lines, rather than randomly.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-323\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7967-1024x768.jpg\" alt=\"IMG_7967\" width=\"730\" height=\"548\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7967-1024x768.jpg 1024w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7967-300x225.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7967-768x576.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>Now that the slab is done, the framers will start working on the interior basement walls next week.\u00a0 Once those are done they can lay down the first floor framing and then we start building up.<\/p>\n<p>Framing is expected to take about 4 months.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The pouring of the basement slab is somewhat of a milestone, as it means we are close to getting out of the ground and building up. The concrete team has been working for weeks to prep the basement floor for the slab pour.\u00a0 The floor started out with just bare dirt, the interior wall footings,<a class=\"moretag\" href=\"http:\/\/buildingfromscratch.com\/index.php\/2016\/07\/29\/basement-slab\/\"><span class=\"screen-reader-text\">Read more about Basement slab<\/span>[&#8230;]<\/a><\/p>\n","protected":false},"author":1,"featured_media":318,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[10],"tags":[],"class_list":["post-313","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-foundation"],"aioseo_notices":[],"_links":{"self":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/313","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/comments?post=313"}],"version-history":[{"count":1,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/313\/revisions"}],"predecessor-version":[{"id":325,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/313\/revisions\/325"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/media\/318"}],"wp:attachment":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/media?parent=313"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/categories?post=313"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/tags?post=313"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}