{"id":300,"date":"2016-07-20T14:15:17","date_gmt":"2016-07-20T22:15:17","guid":{"rendered":"http:\/\/buildingfromscratch.com\/?p=300"},"modified":"2016-07-20T14:22:06","modified_gmt":"2016-07-20T22:22:06","slug":"backfill","status":"publish","type":"post","link":"http:\/\/buildingfromscratch.com\/index.php\/2016\/07\/20\/backfill\/","title":{"rendered":"Backfill"},"content":{"rendered":"<p>The excavation contractor worked on a the back fill last week.\u00a0 This is the filling in of the space between the outside of the basement walls and the top grade of the lot.\u00a0 As complete, the waterproofing looks like this.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-301\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7309-1024x768.jpg\" alt=\"IMG_7309\" width=\"730\" height=\"548\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7309-1024x768.jpg 1024w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7309-300x225.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7309-768x576.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>At the bottom is the French drain tube.\u00a0 First they drape a fabric down the wall, along the bottom, and up the side of the grade.\u00a0 Then they fill it about 60% of the way up with gravel.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-302\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7445-768x1024.jpg\" alt=\"IMG_7445\" width=\"730\" height=\"973\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7445-768x1024.jpg 768w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7445-225x300.jpg 225w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>The gravel allows any water that does make it into the ground near the foundation tend ot go down, towards the bottom and the French drain, rather than laterally towards the foundation wall.<\/p>\n<p>Once the have all the gravel in, they wrap it with the fabric like a burrito.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-303\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7469-1024x768.jpg\" alt=\"IMG_7469\" width=\"730\" height=\"548\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7469-1024x768.jpg 1024w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7469-300x225.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7469-768x576.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>This keeps dirt out of the gravel.\u00a0 Dirt would tend to filter down over time and clog the gravel, making it less effective at draining any water down.\u00a0 Once the gravel is done, they fill the rest up with dirt.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-304\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7472-768x1024.jpg\" alt=\"IMG_7472\" width=\"730\" height=\"973\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7472-768x1024.jpg 768w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7472-225x300.jpg 225w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>The initial packing of the dirt and gravel is done with hand-held machines.\u00a0 The final compaction is done with this grading compactor.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-306\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7654-768x1024.jpg\" alt=\"IMG_7654\" width=\"730\" height=\"973\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7654-768x1024.jpg 768w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7654-225x300.jpg 225w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>The finished grading (so far) looks like this:<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-305\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7655-1024x492.jpg\" alt=\"IMG_7655\" width=\"730\" height=\"351\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7655-1024x492.jpg 1024w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7655-300x144.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2016\/07\/IMG_7655-768x369.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>They&#8217;ve completed about 50% of the back fill so far &#8211; just enough to provide access for the concrete contractor to be able to dump sand, and for the steel contractor to drop in the structural steel.\u00a0 They&#8217;ll be back next week to finish the rest.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The excavation contractor worked on a the back fill last week.\u00a0 This is the filling in of the space between the outside of the basement walls and the top grade of the lot.\u00a0 As complete, the waterproofing looks like this. At the bottom is the French drain tube.\u00a0 First they drape a fabric down the<a class=\"moretag\" href=\"http:\/\/buildingfromscratch.com\/index.php\/2016\/07\/20\/backfill\/\"><span class=\"screen-reader-text\">Read more about Backfill<\/span>[&#8230;]<\/a><\/p>\n","protected":false},"author":1,"featured_media":304,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[8,10],"tags":[],"class_list":["post-300","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-excavation","category-foundation"],"aioseo_notices":[],"_links":{"self":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/300","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/comments?post=300"}],"version-history":[{"count":1,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/300\/revisions"}],"predecessor-version":[{"id":307,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/300\/revisions\/307"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/media\/304"}],"wp:attachment":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/media?parent=300"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/categories?post=300"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/tags?post=300"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}