{"id":1952,"date":"2019-02-10T15:03:38","date_gmt":"2019-02-10T23:03:38","guid":{"rendered":"http:\/\/buildingfromscratch.com\/?p=1952"},"modified":"2019-02-10T15:03:38","modified_gmt":"2019-02-10T23:03:38","slug":"pool-house-deck","status":"publish","type":"post","link":"http:\/\/buildingfromscratch.com\/index.php\/2019\/02\/10\/pool-house-deck\/","title":{"rendered":"Pool house deck"},"content":{"rendered":"<p>Our pool house was mostly complete, but lacking the deck and the shower slab.\u00a0 That work started in December.<\/p>\n<p>First, the steps leading up to the deck, and the supports around the deck had to be poured.\u00a0 We also added a collar around the old fireplace foundation for good measure; that 100+ year old formerly outdoor fireplace was sitting on rock and dirt.\u00a0 The concrete collar will help to keep all that together.<\/p>\n<p>Here is the forming for the steps and central footings.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1953\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/IMG_4267-1280x960.jpg\" alt=\"\" width=\"730\" height=\"548\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/IMG_4267-1280x960.jpg 1280w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/IMG_4267-300x225.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/IMG_4267-768x576.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>Here are the finished steps with the fireplace foundation collar \/ deck joist support behind.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1954\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/IMG_4303-1280x960.jpg\" alt=\"\" width=\"730\" height=\"548\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/IMG_4303-1280x960.jpg 1280w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/IMG_4303-300x225.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/IMG_4303-768x576.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>Note the retaining wall on the left; that was previously poured.<\/p>\n<p>Here is the outdoor shower area, freshly poured.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1956\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/IMG_4290-1280x960.jpg\" alt=\"\" width=\"730\" height=\"548\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/IMG_4290-1280x960.jpg 1280w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/IMG_4290-300x225.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/IMG_4290-768x576.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>Once those were done, the dirt was graded flat and filled with gravel.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1955\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/IMG_4505-1280x960.jpg\" alt=\"\" width=\"730\" height=\"548\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/IMG_4505-1280x960.jpg 1280w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/IMG_4505-300x225.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/IMG_4505-768x576.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>While most of the deck is covered by the pool house roof, the tow sides are open, and some of the french drains from the hillside on the right, empty into that area.\u00a0 The area under the deck will act to allow the water to percolate into the ground, rather than running off the property.<\/p>\n<p>Following the gravel, came the deck framing.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1957\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/IMG_4653-1280x960.jpg\" alt=\"\" width=\"730\" height=\"548\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/IMG_4653-1280x960.jpg 1280w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/IMG_4653-300x225.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/IMG_4653-768x576.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>Now, the IPE decking is about half way complete.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1959\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/Screen-Shot-2019-02-10-at-3.02.21-PM-1280x492.png\" alt=\"\" width=\"730\" height=\"281\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/Screen-Shot-2019-02-10-at-3.02.21-PM-1280x492.png 1280w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/Screen-Shot-2019-02-10-at-3.02.21-PM-300x115.png 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2019\/02\/Screen-Shot-2019-02-10-at-3.02.21-PM-768x295.png 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Our pool house was mostly complete, but lacking the deck and the shower slab.\u00a0 That work started in December. First, the steps leading up to the deck, and the supports around the deck had to be poured.\u00a0 We also added a collar around the old fireplace foundation for good measure; that 100+ year old formerly<a class=\"moretag\" href=\"http:\/\/buildingfromscratch.com\/index.php\/2019\/02\/10\/pool-house-deck\/\"><span class=\"screen-reader-text\">Read more about Pool house deck<\/span>[&#8230;]<\/a><\/p>\n","protected":false},"author":1,"featured_media":1959,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[37],"tags":[],"class_list":["post-1952","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pool-house"],"aioseo_notices":[],"_links":{"self":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/1952","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/comments?post=1952"}],"version-history":[{"count":1,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/1952\/revisions"}],"predecessor-version":[{"id":1960,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/1952\/revisions\/1960"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/media\/1959"}],"wp:attachment":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/media?parent=1952"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/categories?post=1952"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/tags?post=1952"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}