{"id":1537,"date":"2018-05-31T03:35:40","date_gmt":"2018-05-31T11:35:40","guid":{"rendered":"http:\/\/buildingfromscratch.com\/?p=1537"},"modified":"2018-05-31T03:35:40","modified_gmt":"2018-05-31T11:35:40","slug":"cabinet-finishing","status":"publish","type":"post","link":"http:\/\/buildingfromscratch.com\/index.php\/2018\/05\/31\/cabinet-finishing\/","title":{"rendered":"Cabinet finishing"},"content":{"rendered":"<p>The cabinet makers have been here for a couple of weeks now doing the finishing in the cabinets.\u00a0 There is surprisingly a lot to do.<\/p>\n<p>&#8211; Adjust and level cabinet doors<br \/>\n&#8211; Install knobs and pulls<br \/>\n&#8211; Install cabinet class<br \/>\n&#8211; Install kick plates after flooring goes in<\/p>\n<p>Lisa spent weeks looking at knobs and pulls to find the best fit at the best price, and it is really paying off. They look great.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1538\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2018\/05\/IMG_0853-1280x960.jpg\" alt=\"\" width=\"730\" height=\"548\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2018\/05\/IMG_0853-1280x960.jpg 1280w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2018\/05\/IMG_0853-300x225.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2018\/05\/IMG_0853-768x576.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1539\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2018\/05\/IMG_0854-768x1024.jpg\" alt=\"\" width=\"730\" height=\"973\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2018\/05\/IMG_0854-768x1024.jpg 768w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2018\/05\/IMG_0854-225x300.jpg 225w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>All-in-all we&#8217;ve got somewhere in the neighborhood of 400 knobs and pulls all over the house.<\/p>\n<p>Two floors done, one to go.\u00a0 It is a long process.\u00a0 As part of the process, they find out what is missing or wrong.\u00a0 It is a pretty big project to install custom cabinets and paint them in place, and some things are bound to get done incorrectly, missed, or misplaced.<\/p>\n<p>&#8211; A panel for a panel ready appliance that is missing its center panel<br \/>\n&#8211; A kick plate painted the wrong color<br \/>\n&#8211; A missing drawer front that likely got misplaced in the cabinet painter&#8217;s shop<br \/>\n&#8211; Items we thought we ordered but didn&#8217;t<\/p>\n<p>As part of the process we have to build a list of what is wrong, have the missing pieces made, and then route everything to the cabinet painters for painting.<\/p>\n<p>We&#8217;ll need the cabinet painters back for one more round of touch-up to catch and miss-drills on the knobs and pulls (not many but they do happen) and to repair any cabinets damaged by other workers.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The cabinet makers have been here for a couple of weeks now doing the finishing in the cabinets.\u00a0 There is surprisingly a lot to do. &#8211; Adjust and level cabinet doors &#8211; Install knobs and pulls &#8211; Install cabinet class &#8211; Install kick plates after flooring goes in Lisa spent weeks looking at knobs and<a class=\"moretag\" href=\"http:\/\/buildingfromscratch.com\/index.php\/2018\/05\/31\/cabinet-finishing\/\"><span class=\"screen-reader-text\">Read more about Cabinet finishing<\/span>[&#8230;]<\/a><\/p>\n","protected":false},"author":1,"featured_media":1538,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[35],"tags":[],"class_list":["post-1537","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cabinets-mill-work"],"aioseo_notices":[],"_links":{"self":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/1537","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/comments?post=1537"}],"version-history":[{"count":1,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/1537\/revisions"}],"predecessor-version":[{"id":1540,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/1537\/revisions\/1540"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/media\/1538"}],"wp:attachment":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/media?parent=1537"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/categories?post=1537"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/tags?post=1537"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}