{"id":1383,"date":"2018-03-28T12:02:23","date_gmt":"2018-03-28T20:02:23","guid":{"rendered":"http:\/\/buildingfromscratch.com\/?p=1383"},"modified":"2018-03-28T12:03:20","modified_gmt":"2018-03-28T20:03:20","slug":"cabinet-painting-is-almost-done","status":"publish","type":"post","link":"http:\/\/buildingfromscratch.com\/index.php\/2018\/03\/28\/cabinet-painting-is-almost-done\/","title":{"rendered":"Cabinet painting is almost done"},"content":{"rendered":"<p>The cabinet painters have been at it for almost 5 weeks now.\u00a0 We are at the point where I am inspecting all the paint and flagging anything that needs touch up.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1384\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2018\/03\/IMG_9751-768x1024.jpg\" alt=\"\" width=\"730\" height=\"973\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2018\/03\/IMG_9751-768x1024.jpg 768w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2018\/03\/IMG_9751-225x300.jpg 225w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>It&#8217;s tedious work, and I&#8217;ve probably spent 4-5 hours on inspections so far, with a few cabinets left to go.\u00a0 We have a lot of cabinets in this house.<\/p>\n<p>The rest of the stone tops should go on later this week; we just ordered the few remaining slabs that we need.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The cabinet painters have been at it for almost 5 weeks now.\u00a0 We are at the point where I am inspecting all the paint and flagging anything that needs touch up. It&#8217;s tedious work, and I&#8217;ve probably spent 4-5 hours on inspections so far, with a few cabinets left to go.\u00a0 We have a lot<a class=\"moretag\" href=\"http:\/\/buildingfromscratch.com\/index.php\/2018\/03\/28\/cabinet-painting-is-almost-done\/\"><span class=\"screen-reader-text\">Read more about Cabinet painting is almost done<\/span>[&#8230;]<\/a><\/p>\n","protected":false},"author":1,"featured_media":1384,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[35,40],"tags":[],"class_list":["post-1383","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cabinets-mill-work","category-paint"],"aioseo_notices":[],"_links":{"self":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/1383","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/comments?post=1383"}],"version-history":[{"count":1,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/1383\/revisions"}],"predecessor-version":[{"id":1385,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/1383\/revisions\/1385"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/media\/1384"}],"wp:attachment":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/media?parent=1383"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/categories?post=1383"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/tags?post=1383"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}