{"id":1036,"date":"2017-10-23T11:16:55","date_gmt":"2017-10-23T19:16:55","guid":{"rendered":"http:\/\/buildingfromscratch.com\/?p=1036"},"modified":"2017-10-23T11:17:35","modified_gmt":"2017-10-23T19:17:35","slug":"drywall-update","status":"publish","type":"post","link":"http:\/\/buildingfromscratch.com\/index.php\/2017\/10\/23\/drywall-update\/","title":{"rendered":"Drywall update"},"content":{"rendered":"<p>Drywall is going in rapidly.\u00a0 They are now almost done putting up the drywall on the first floor.\u00a0 Here is our living room.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1037\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6849-1280x960.jpg\" alt=\"\" width=\"730\" height=\"548\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6849-1280x960.jpg 1280w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6849-300x225.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6849-768x576.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>They have installed all the corner bead on the second floor and have started taping and mudding the joints.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-1038\" src=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6900-1280x960.jpg\" alt=\"\" width=\"730\" height=\"548\" srcset=\"http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6900-1280x960.jpg 1280w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6900-300x225.jpg 300w, http:\/\/buildingfromscratch.com\/wp-content\/uploads\/2017\/10\/IMG_6900-768x576.jpg 768w\" sizes=\"auto, (max-width: 730px) 100vw, 730px\" \/><\/p>\n<p>We have a tentative date of November 20th for the first cabinets to go in, and hopefully the laying of the stone for the outdoor porches, patios, and stairs should start about that time.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Drywall is going in rapidly.\u00a0 They are now almost done putting up the drywall on the first floor.\u00a0 Here is our living room. They have installed all the corner bead on the second floor and have started taping and mudding the joints. We have a tentative date of November 20th for the first cabinets to<a class=\"moretag\" href=\"http:\/\/buildingfromscratch.com\/index.php\/2017\/10\/23\/drywall-update\/\"><span class=\"screen-reader-text\">Read more about Drywall update<\/span>[&#8230;]<\/a><\/p>\n","protected":false},"author":1,"featured_media":1037,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[31,34],"tags":[],"class_list":["post-1036","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-drywall","category-tile-stone"],"aioseo_notices":[],"_links":{"self":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/1036","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/comments?post=1036"}],"version-history":[{"count":1,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/1036\/revisions"}],"predecessor-version":[{"id":1039,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/posts\/1036\/revisions\/1039"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/media\/1037"}],"wp:attachment":[{"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/media?parent=1036"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/categories?post=1036"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/buildingfromscratch.com\/index.php\/wp-json\/wp\/v2\/tags?post=1036"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}